Home

March Recap

It was a good month. Some of it went where I planned, and the rest was a bit of a mystery.

The planned:

  1. Rowdy’s quilt √
  2. SAHRR /
  3. Riley Blake X
  4. RSC Block √
  5. Embroidery √
  6. Guild BOM X

√ Done / In Progress X Not Done

Rowdy Like a Fox was finished right after his arrival! SAHRR was done to the flimsy stage, but not quilted. No more RB blocks, have to catch up. But I did get the RSC green block done. And lots of embroidery, stayed tuned for even more! No guild blocks.

The Unplanned:

  1. More Embroidery! √
  2. Puppy Comfort Pillows √
  3. Pillowcases √
  4. Flannel PJs for Squish √
  5. Flannel bib for Rowdy √
  6. Baby Charity Quilts √
  7. Charity Quilting √
  8. Easter Rocking Chair Pillow √
  9. Rope Bowl √

√ Done / In Progress X Not Done

Stats
Fabric In: +10
Fabric Out: -10.18
Destash: -0
Fabric YTD: +20.46
Spending YTD: $1076.97

Yarn In: +0 yards 0 skein
Yarn Out: -0 yards 0 skein
YTD: -341 yards 2 skein

Looking forward to April:

Quilt a lot!! SAHRR needs to be done. I have 6 more items waiting in the closet to see frame time. I have a Charity quilt to finish piecing and another baby top to quilt. And still more embroidery!!! This time for Rowdy since I received my 4×4 hoop!

11 thoughts on “March Recap

  1. A lot of unplanned projects, but they are all so pretty! Rowdy’s quilt is beautiful, I love it, and I bet he will too 😉 You are mastering embroidery so well, cute designs. I love your rope bowl too!!
    Thank you for sharing your inspirational projects and linking up!

Cat got your tongue?

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.